OSeMOSYS
  • Home
  • About
  • Applications
    • Starter Kits
    • GENeSYS-MOD
    • GLUCOSE
    • OSeMBE
    • ATLANTIS
    • TEMBA
    • SAMBA
    • Cypriot energy system
    • OTHER APPLICATIONS
  • Get started
    • Interfaces
    • Understanding the Energy System
  • News and Events
The Electricity Model Base for Africa (TEMBA)
TEMBA is the world's first model of African electricity supply that represents each continental African country's electricity supply system and transmission links between them. An initial version was first developed to inform the World Energy Outlook of 2014 and was sponsored by SIDA. The model is open source and written in OSeMOSYS.

TEMBA is constantly being updated and the current version is TEMBA_2807. Due to large size of the model, and consequently long solve times, users are advised to employ a powerful solver (e.g. CPLEX or Gurobi)
download TEMBA model and data files

TEMBA: Interactive Results

TEMBA: Trade in 2020
BASE 
Picture
EXPANDED TRADE
Picture

TEMBA: Trade in 2030
BASE
Picture
EXPANDED TRADE
Picture

TEMBA: Trade in 2040
BASE
Picture
EXPANDED TRADE
Picture
Powered by Create your own unique website with customizable templates.
  • Home
  • About
  • Applications
    • Starter Kits
    • GENeSYS-MOD
    • GLUCOSE
    • OSeMBE
    • ATLANTIS
    • TEMBA
    • SAMBA
    • Cypriot energy system
    • OTHER APPLICATIONS
  • Get started
    • Interfaces
    • Understanding the Energy System
  • News and Events